Search our Help.

Can you have multiple Bill Of Materials for a single Product Code?

Follow

Answer: 

You can only have one Bill Of Materials (BOM) per Assembled product, so you could create one Bill Of Materials with all necessary components and remove the appropriate ones as you run the assembly.

 

Alternatively, you could create a variant assembled product for each of the factories so they can have their own BOMs, however, this would mean that you have the same product listed under different product codes.

 

Additional Information: 

Bill of Materials

Was this article helpful?
0 out of 0 found this helpful